text.skipToContent text.skipToNavigation

Sabond - Belgian quality panel for Chinese machine


Plastigi, a specialist in rotational moulding, had a machine built in China. Upon installation, it became apparent that the cabinets for powering the moulds and control did not comply with Belgian standards. Installer Sabond brought in Breemes for advice and the design of a low-voltage panel that did comply.

"With their knowledge and commitment, we were able to successfully complete the power section of the mould heating."

 
Plastigi in Herentals (B) specializes in the rotational molding of high-quality plastic products. In this process, plastic powder is heated in a rotating mold, so that it melts evenly against the wall and forms a hollow product. The products are supplied, among others, to sister company Valiente, which supplies champagne coolers and flower pots in exclusive designs. Traditionally, the molds are brought to the correct temperature using heating oil or gas. Plastigi has chosen sustainability and is now a pioneer with ‘zero emission’; the molds are electrically heated using ‘green’ electricity. This requires substantial power, so a reliable and safe power supply is crucial. At the same time, this sector is also facing price pressure. This prompted Plastigi to develop a rotational molding machine together with a Chinese machine builder.

Power supply and energy distribution

The mold heating became part of a complete robotic installation. Electrical installer Sabond was brought in for the power supply and electrical connection, explains managing director Bert Aerts. Sabond (Service Aerts Bert ONDerhoud) in Tessenderlo (B) was mainly active in the food industry and has expanded into other industries in recent years. “So last November, we were approached by Plastigi. We had to take responsibility for controlling the heating of the molds; ensuring the power supply and distributing the energy to the right locations. The problem Plastigi encountered was that the Chinese machine, with its control and power cabinet, did not comply with Belgian standards and some optimizations were required. They asked us to make a proposal on how to resolve this.”

“The Chinese machine, with control and power cabinet, did not comply with Belgian standards and some optimizations needed to be made”

Bert called on Breemes, in the person of electrical engineering consultant Gert Vanwezemael. “They are our partner for the supply of electrical components and support in that area. So I went with Gert to the site to see how we could bring the power, 500 amps, to the machine. The question was how we could properly distribute that power in the cabinets according to Belgian standards and how we could equip them with the necessary protection devices. “There were European-approved components on the panels, but there was no way the entire device complied with the European standard. So it was important to consider how we could obtain approval from the inspection body – perhaps by replacing some items with components that are accepted here in terms of standards.”

Short-term solution

It turned out that modifying one cabinet was practically unfeasible, Aerts reports. “So we chose to build a new cabinet for the energy distribution, while we modified the other cabinet and put it into use temporarily. It still contains a power switch from a European brand that complies with Chinese standards. We will probably still have to replace it if we want to get everything technically approved.” Vanwezemael got to work on the new cabinet. “Based on the required power, voltage and current, I carried out a complete low-voltage study. This included short-circuit and cable cross-section calculations and configuration of a low-voltage panel in Sivacon S4 from Siemens. Naturally, I based this on the standards that are applicable here. After discussing and modifying my design, we supplied Sabond's order and I went to supervise them during the assembly of the panels.&rdquo

“The customer is satisfied with it”

Meanwhile, the installation at Plastigi for one part of the machine is almost complete, and that is quite fast after the initial inquiry came in November, Vanwezemael feels. “We are now at the beginning of March, and Bert has managed to get everything properly installed and almost ready for use in a relatively short time.” A lot of energy has gone into getting it working on time, Bert confirms. “It wasn't a matter of plugging it in and having everything start running. A number of issues came to light and we had to resolve them. Approval for the quotation came at the beginning of December, and we had the mechanical assembly completed by the beginning of January. Gert really had to push hard to meet the delivery times for the materials, and we simply continued working between Christmas and New Year's. The result speaks for itself; the customer is satisfied.” The inspection still has to take place, but Aerts and Vanwezemael are fully confident about that.

A great deal of support

In any case, the experience was positive in terms of the cooperation with Breemes and the ease of use of the Siemens Sivacon S4 cabinets in combination with the Siemens switchgear, Aerts says in conclusion. “During the assembly, a few gaps came to light that we had not taken into account. At one point, Gert himself drove around to get the required materials to the right place. Breemes really put a tremendous amount of energy into it. That is one of the reasons why we work with them; with their knowledge and commitment, they enable us to bring a project like this to a successful conclusion. If we had all had to figure it out ourselves in order to get those materials on time, it would have cost us a lot. We received a great deal of support from Gert here. The project is not finished yet, but I am already working with him on another project.”

  

  

Check out our other success stories:

  • TESTIMONIAL
    18.06.2026
    Henkelman - Opportunities for Kittens
    For a long time, itsme was just a “small” supplier of electrical components to Henkelman, a manufacturer of vacuum sealers. That changed when Andreas Klein joined Henkelman as a supply chain engineer in late 2024. During his studies, he had become familiar with procurement kitting, and now he saw opportunities to make procurement at his new employer more efficient, with itsme as a partner. In his current role as procurement manager, he is constantly looking for ways to further optimize costs across the board.
    Read more
  • TESTIMONIAL
    14.05.2026
    Bilfinger - Urgent Need for a Service-Oriented Client
    Technical services provider Bilfinger performs, among other things, routine and emergency maintenance in the process industry. In that sector, production downtime is very costly. When replacement parts are needed, it’s always a matter of urgency. At itsme, they’re used to that. “We excel at responding very quickly to our customers. If necessary, we’ll search the entire market.”
    Read more
  • TESTIMONIAL
    15.04.2026
    Uniper - Flexibility deployed for continuity
    Continuity of energy supply is the top priority for energy company Uniper. The modernization of the control technology required training for programmers, technicians, and engineers.
    Read more
  • TESTIMONIAL
    17.02.2026
    LyondellBasell - Improving Safety in the Blink of an Eye
    LyondellBasell in Geleen is a mechanical recycling company that processes plastic waste.
    Read more

Stay up to date with the latest news:

  • NEWS
    11.03.2026
    Danfoss - Install with confidence
    As an installer or machine manufacturer (OEM), you always strive for the highest quality and reliability. In a world where machines are becoming increasingly intelligent and connected, this also means that the digital robustness of every component counts. A modern frequency converter is the beating heart of your system and requires built-in reliability.
    Read more
  • NEWS
    10.11.2025
    Danfoss - Harmony in your installation
    Harmonic distortion, also known as harmonics, is a common problem in electrical installations. These are disturbances in the sinusoidal voltage and current in an electricity grid, which lead to poor grid quality, unreliability and even damage to equipment. They are caused by non-linear loads, such as frequency converters, switching power supplies, modern LED lighting and welding equipment.
    Read more
  • NEWS
    22.08.2025
    Danfoss - Smart frequency converters
    Good news for building managers! Danfoss has developed a new generation of frequency converters that can significantly reduce the energy consumption of ventilation and climate control systems (AHUs).
    Read more
  • NEWS
    07.07.2025
    Danfoss - Smart Solutions for Pump Challenges in Utility Buildings
    Pump systems in utility buildings can be complex and challenging. From wear and tear to energy loss, many factors can affect performance. Fortunately, Danfoss frequency converters offer solutions that effectively address these issues.
    Read more

Why not take a look at these trainings we offer: